PHOTOS

VIDEOS
IN BRIEF
Construction began in 2004, and on 24 July 2009, at exactly 12 o'clock, in keeping with Austrian tradition, the 500-thousandth cubic metre of concrete poured into the dam wall was ceremonially marked.[2]
The dam wall was fully completed at the beginning of 2010. A new Devin–Mihalkovo bypass road, 10 km long, was also built, together with a 900 m tunnel and the rehabilitation of a 10 km stretch of the old Devin–Lyaskovo road.
Reservoir data:
- Built – 2010
- Location – Smolyan Province
- Altitude – 688.5 m
- Water volume – 111,000,000 m3
- Height of the dam wall – 130.5 m
- Length of the dam wall – 468 m
- Short film about the construction of the wall and the road – Video on YouTube